All of the new concrete surface at Bandimere Speedway from the 660' mark to
past the finish line has been placed, and the new asphalt from the finish to
the sand traps are completed. The first 400 foot of concrete was placed on
Monday, December 3rd, and the final pour was completed on Monday, December
10th.